Mcguinness demolition logo
Mcguinness demolition phone number 0161 273 5272
  • Links
  • Contact
  • About
  • Demolition
  • Asbestos
  • Emergency Callout
  • Recycling and The Environment
  • Earthworking & Landscaping
  • Plant Hire
  • Case Studies
  • Testimonials
  • Health & Safety
  • Quality & Certification
  • News
  • History
  • member of construction line trade association logo
  • The Contractors Health and Safety Assessment Scheme logo
  • National Federation of Demolition Contractors logo
  • The Asbestos Removal Contractors Association logo
  • The British Safety Council logo

P.McGuinness & Co Ltd, Rondin House, Rondin Road, Ardwick, Manchester, M12 6BF

Phone: 0161 273 5272/6
Fax: 0161 274 3884
Email: demolition@pmcguinness.com

Chinatown Fire...

Chinatown Fire...

P McGuinness was first on the scene following a serious fire in the Chinatown district of...



read more

Case Studies

Chinatown Fire....

Tue, 29 Nov 2016

Chinatown Fire....

P McGuinness was first on the scene to take the roof off the building following a serious fire in Manchester's Chinatown. 

http://www.manchestereveningnews.co.uk/news/greater-manchester-news/chinatown-fire-two-men-died-12236884 

Canteena Bar

Fri, 01 May 2009

Canteena Bar

Canteena Bar - Emergency demolition for Manchester City Council to demolish the bar as it was condemned due to being structurally unsafe.

Canteena - The start of the demolition: the 350 cat high reach with pulverisor was used to demolish the lower two level block.Canteena - The lower two level block was demolished and then work on the tower block started.Canteena - The 350 cat high reach with pulverisor was used to demolish the tower block.Canteena - Once the demolition was completed, the site was levelled.

Parbold, Warrington

Thu, 30 Apr 2009

Parbold, Warrington

The company was instructed by a Commercial Builder to demolish and clear a large effluent treatment plant.

Parbold - The start of the job: 2 track machines broke out reinforced concrete silo.Parbold - The 350 long reach excavator in action.Parbold - Wheeled excavator and long reach breaking out concrete.Parbold - Close up of wheeled excavator and long reach breaking out concrete.Parbold - Close up of wheeled excavator breaking up concrete.Parbold - Close up of broken reinforced concrete.Parbold - Silo completely demolished and the site ready for final remediation.

Manchester United Football Club

Wed, 25 Mar 2009

Manchester United Football Club

Job Description: Removal of cable bridge to MUFC / Old Trafford

P McGuinness & Co ltd were asked to remove a bridge containing disused cabling from outside Old Trafford football ground. Access to the site was restricted, and a tight timescale was placed on the job.

MUFC - Prior to the start of the job - left hand elevation of bridge leading to the MUFC ground.MUFC - Middle section of the bridge.MUFC - End elevation of the bridge.MUFC - Crane lifting out section of bridge.
Chinatown Fire....

Chinatown Fire....

P McGuinness was first on the scene to take the roof off the building following a serious fire...



read more

Canteena Bar

Canteena Bar

Canteena Bar - Emergency demolition for Manchester City Council to demolish the bar...



read more

Related Link